Mold design solutions

m

BEG offers a structured, hands-on program to reduce job time and improve job change quality. Spanning seven visits over eight weeks, the initiative begins with training and workshochangeps, using lean manufacturing tools to streamline processes. By shifting steps to external tasks and simplifying internal ones, BEG enables faster, more efficient job changes. This leads to lower costs, smaller lot sizes, reduced inventory, and improved responsiveness, all supported by ongoing expert guidance.

  • Mold design with detailed engineering
  • Scalable production support options
  • On-site and offsite sampling available
  • Possible support during initial production runs
  • Optional sample mold equipment
  • Controlled production launch
  • Reduced risk during initial runs
  • High-quality mold engineering
  • Flexible support options
  • Access to advanced testing facilities